Latest [Oct 17, 2022] Real SAP C_TS422_2020 Exam Dumps Questions
C_TS422_2020 Dumps To Pass SAP Certified Application Associate Exam in One Day (Updated 150 Questions)
NEW QUESTION 66
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work Center BOM
- B. Functional Location BOM
- C. Class BOM
- D. Sales Order BOM
Answer: B,D
NEW QUESTION 67
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?
- A. Enter the operation scrap and set the net indicator in the component of the bill of material of the assembly.
- B. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
- C. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where V Dthe component is used
- D. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
Answer: C
NEW QUESTION 68
What must be used in the system to plan the requirements for different subcontractors separately?
- A. Production versions
- B. Storage locations
- C. Planning plant
- D. MRP areas
Answer: D
NEW QUESTION 69
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the reorder point.
- D. Use the fixed lot size procedure.
Answer: D
NEW QUESTION 70
What is the purpose of collective orders?
- A. To manage production orders for an entirefinished product on multiple levels
- B. To combine order management of co-products and by-products with the main product
- C. To post production costs ona cost collector instead of the production order
- D. To post any component withdrawals single back flush with order confirmation
Answer: A
NEW QUESTION 71
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.
- A. Storage location data
- B. MRP area data
- C. Production version data
- D. Warehouse number data
Answer: A,D
NEW QUESTION 72
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Infinite resource and finite strategy
- B. Finite resource and infinite strategy
- C. Finite resource and finite strategy
- D. Infinite resource and infinite strategy
Answer: C
NEW QUESTION 73
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question.
- A. Create and assign a new graphical object for setup time in the planning board.
- B. Run setup minimization heuristics or optimizer.
- C. Create and assign setup group/setup keys in the production data structure.
- D. Create and assign a setup matrix with setup transition time to the resource
Answer: A,D
NEW QUESTION 74
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. Replenishments are created close to the actual need
- B. Replenishments are based on centralized planning
- C. It is mostly accomplished by manual postings
- D. It is a simplified form of production control
Answer: A,D
NEW QUESTION 75
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.
- A. Planning time fence
- B. Goods receipt processing time
- C. Opening period
- D. Planned delivery time
Answer: B,C
NEW QUESTION 76
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?
- A. When multiple operations are maintained for one product
- B. When alternate resources are used within one operation
- C. When multiple production versions are maintained for one product
- D. When multiple planned orders exists in one resource
Answer: B
NEW QUESTION 77
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Individualconversion
- B. Partial conversion
- C. Full conversion
- D. Order release
Answer: B,C
NEW QUESTION 78
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a planned order.
- B. It is converted into a reservation.
- C. It is converted into a production order.
- D. It is converted into a schedule line.
Answer: B
NEW QUESTION 79
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.
- A. Documentation of quality data with Quality Management
- B. Recipe approval (with Engineering Change Management)
- C. Use of the GMP compliant flag in relevant master data applications
- D. Predefined GMP compliant process order types to meet audit requirements
- E. Use of the digital signature function to check and run business processes
Answer: A,B,E
NEW QUESTION 80
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Material Requirements Planning (MRP)
- C. Capacity Requirements Planning (CRP)
- D. Supply Network Planning (SNP)
Answer: B
NEW QUESTION 81
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of dependent requirements
- B. Creation of a purchasing contract
- C. Change of the storage bin
- D. Creation of a sales order
- E. Change of the material'sprocurement type
Answer: A,D,E
NEW QUESTION 82
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
- A. Bil1 of material
- B. Cost collector
- C. Production version
- D. Repetitive manufacturing profile
Answer: C
NEW QUESTION 83
What is a typical transportation processing SAP Transportation Management?
- A. Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
- B. Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
- C. Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting
- D. Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting
Answer: B
NEW QUESTION 84
For what production type are production orders used?
- A. Period and quantity-oriented production
- B. Process manufacturing processes
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
Answer: C
NEW QUESTION 85
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The plant-specific status
- B. The cross-plant status
- C. The most restrictive status
- D. The least restrictive status
Answer: C
NEW QUESTION 86
......
SAP C_TS422_2020 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
C_TS422_2020 Exam Certification Details:
| Cut Score: | 56% |
| Duration: | 180 mins |
| Sample Questions: | SAP C_TS422_2020 Exam Sample Question |
| Languages: | English |
| Exam: | 80 questions |