NCARB Project-Planning-Design Exam Overview:
| Certification Vendor: | NCARB |
|---|---|
| Exam Name: | ARE 5.0 Project Planning & Design |
| Exam Number: | PPD |
| Exam Price: | $235 USD |
| Real Exam Qty: | 100 |
| Certificate Validity Period: | 5 years from completion |
| Passing Score: | Scaled score 600+ |
| Available Languages: | English |
| Exam Duration: | 245 minutes |
| Exam Format: | Check-all-that-apply, Drag-and-place, Multiple-choice, Case studies |
| Related Certifications: | ARE 5.0 Project Management ARE 5.0 Programming & Analysis ARE 5.0 Construction & Evaluation ARE 5.0 Practice Management ARE 5.0 Project Development & Documentation |
| Recommended Training: | NCARB ARE 5.0 Resources |
| Exam Registration: | NCARB Official Registration |
| Sample Questions: | ![]() |
| Exam Way: | In-person at PSI test centers or online proctored |
| Pre Condition: | Active NCARB Record; completion of education requirements (NAAB-accredited degree or equivalent); progress in Architectural Experience Program (AXP) |
| Official Syllabus URL: | https://www.ncarb.org/pass-the-are/prepare/project-planning-design |
NCARB Project-Planning-Design Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Project Costs & Budgeting | 8-14% | - Evaluation of design alternatives - Cost estimation and analysis - Budget compliance and optimization |
| Project Integration of Program & Systems | 32-38% | - Integration of systems and assemblies - Building configuration and form - Alignment with program requirements - Coordination of contextual and regulatory factors |
| Building Systems, Materials, & Assemblies | 19-25% | - Building materials and assemblies - Mechanical, electrical, and plumbing systems - Enclosure and thermal performance - Structural systems |
| Environmental Conditions & Context | 16-22% | - Environmental and climatic considerations - Sustainable design principles - Neighborhood and contextual impact - Site analysis and building placement |
| Codes & Regulations | 16-22% | - Building codes and life safety requirements - Environmental regulations - Accessibility standards - Zoning and land use regulations |
Frequently Asked Questions About NCARB ARE 5.0 Project Planning & Design (PPD)
NCARB Official Registration: register for Project-Planning-Design
Active NCARB Record; completion of education requirements (NAAB-accredited degree or equivalent); progress in Architectural Experience Program (AXP)
- Project Costs & Budgeting (8-14%)
- Environmental Conditions & Context (16-22%)
- Building Systems, Materials, & Assemblies (19-25%)
Allocate study time in proportion to each topic's weight.
The Project-Planning-Design exam has 100 questions with a 245 minutes-minute time limit. Practicing under the same constraints on ExamsTorrent builds the pacing habits you will need on test day.
The PC engine installs on your computer and simulates the real exam scenario with timed tests and performance marking. The online engine runs in your browser, needs no installation, works on most devices, and is often the more stable option when you switch machines frequently.
NCARB ARE 5.0 Resources: Visit official page
A passing result on Project-Planning-Design requires Scaled score 600+, and the official exam fee is $235 USD. Knowing both numbers upfront helps you budget your study time and money realistically.
The package includes 102 practice questions for the Project-Planning-Design exam, covering the current NCARB ARE 5.0 Project Planning & Design (PPD) objectives with verified answers.
We support Credit Card payment because it is built around buyer protection: if a purchase issue ever arises, the card network's dispute process protects your money. Combined with our refund policy, that keeps your NCARB ARE 5.0 Project Planning & Design (PPD) purchase low-risk.
NCARB ARE 5.0 Project Planning & Design (PPD) Sample Questions:

Refer to the exhibit (building with wind impacting wall A, and openings shown).
For the building subjected to wind as shown, the design pressure acting on the interior face of wall A would be what?
- A. Acting both toward and away from wall A
- B. Acting toward wall A only
- C. Zero
- D. Acting away from wall A only
Correct Answer: A 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
Which of the following design elements will affect pedestrian security within a site? Check the four that apply.
- A. Number of site access points
- B. Type of landscaping
- C. Location of adjacent activity
- D. Impervious pavement
- E. Parking quantity
- F. Transparency of fences and barriers
Correct Answer: A,B,C,F 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school's increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
*The relocated front entrance must be easily recognizable, highly visible, and secure.
*Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
*Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
*Construction Type is II-B.
The following resources are available for your reference:
*Existing Plans, including site and floor plans
*Proposed Plans, including site and floor plans
*Cost Analysis
*Zoning Ordinance Excerpts, for off-street parking requirements
*IBC Excerpts, showing relevant code sections
*ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design The project team decides to cover the roof area above the gymnasium and platform with 350 watt, stationary, photovoltaic (PV) panels. Each panel requires 20 square feet, accounting for access aisles and safety clearances. The PV system will be tied to the local power company's electrical grid, and will not have battery storage. The school is located in a region that gets an average of 4 usable hours of sunlight per day.
Which of the following PV system design considerations apply to this project? Check the three that apply.
Refer to the project involving an elementary school renovation and addition with photovoltaic (PV) panels on the gymnasium roof (350-watt panels, 20 sq ft each, ~4 usable sunlight hours/day). The PV system is grid-tied without battery storage.
Which of the following PV system design considerations apply? Check the three that apply.
- A. The gymnasium and platform structural system must be designed to support the load of the PV system.
- B. The PV system will reduce the need for artificial lighting in the gymnasium and platform areas.
- C. The PV panels should be mounted toward the student pick-up/drop-off.
- D. The PV system will produce approximately 95.5 kW during peak sun conditions.
- E. The PV system will be made up of approximately 273 panels.
- F. The PV system will provide emergency power for the school if the grid goes down.
Correct Answer: A,D,E 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
A divisional cost breakdown method of cost estimating has which of the following advantages over a cost per square foot method of cost estimating?
- A. It provides a simple method to calculate costs.
- B. It provides a quick reference or check at the early design stages.
- C. It is useful throughout design and construction of the project.
- D. It is useful for generic buildings.
Correct Answer: C 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
Which of the following is considered when using natural light as the primary source of ambient light to improve building quality and reduce energy costs?
- A. Single switched lighting controls
- B. Exterior shading devices
- C. Clear glazing window wall system
- D. Operable windows located on opposite walls
Correct Answer: B 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).